Tomaga


The Tomaga collection is perfect for mid-sized blocks. The design has the heart of the home, the kitchen, in the centre which flows through to the meals, family room and alfresco – easy living at its best.

Available in 22sq 24sq 29sq 31sq

Key Features

  • Two separate living spaces
  • Perfect for 12.5m wide lots
  • Design suited for busy modern families

Pay just $5000

until slab down

Building your new home is now easier.

Pay just $5000 for your new home with nothing further to pay until completion of slab.

  • $1000 payable for tender preparation.
  • $4000 payable at tender acceptance.
  • The balance of 5% deposit payable on the completion of slab.

Evo Series

Tomaga(22)

bed-black.svg 4 bath-black.svg 2 car-black.svg 2
Width 10.91m
Length 20.39m

Dimensions

House Dimensions

House Area

202.11m2

House Area (sq)

21.8sq

House Length

20.39m

House Width

10.91m
SVG Black Loader

Dimensions

House Dimensions (Tomaga 22)

House Area

202.11m2

House Area (sq)

21.8sq

House Length

20.39m

House Width

10.91m

Customise

Dimensions

For Tomaga 24

House Dimensions (Tomaga 24)

House Area

224.09m2

House Area (sq)

24.1sq

House Length

22.43m

House Width

11.03m

Dimensions

House Dimensions (Tomaga 29)

House Area

265.75m2

House Area (sq)

28.6sq

House Length

22.43m

House Width

12.35m

Dimensions

House Dimensions (Tomaga 31)

House Area

287.26m2

House Area (sq)

30.9sq

House Length

22.43m

House Width

15.59m

Facades

View all available facades

Aura

Bungalow

Caldera

Catena

Evoke

Horizon

Inspire

Omega

Orion

Quantum

Tidal

100% fixed price

site cost guarantee

You can access our guarantee even if your land is currently unregistered. Once registration occurs and we are able to carry out approriate diligence we will be able to give a 100% fixed price site cost guarantee.

The 100% fixed price site cost guarantee is for the period from site start to practical completion and includes the following:

  • if export or import of soil is needed - we pay!
  • if additional piering is needed - we pay!
  • if rock excavation is needed - we pay!
  • Costs associated when saline soils - we pay!