Brampton


Contemporary living at its best offering excellent space, the Brampton is for the social family. The guest room with private ensuite is perfect for in-laws, while upstairs, the huge master suite with large WIR is a delight

Available in 37sq 40sq 43sq

Key Features

  • Guest suite positioned on ground floor perfect for multi-generational living
  • Large entertainers kitchen overlooking looking grand alfresco
  • Grand Façade options for striking street appeal

Pay just $5000

until slab down

Building your new home is now easier.

Pay just $5000 for your new home with nothing further to pay until completion of slab.

  • $1000 payable for tender preparation.
  • $4000 payable at tender acceptance.
  • The balance of 5% deposit payable on the completion of slab.

Floorplans

Allure Series

Brampton(37)

bed-black.svg 5 bath-black.svg 3 car-black.svg 2
Width 12.59m
Length 16.43m

Dimensions

House Dimensions

House Area

336.36m2

House Area (sq)

36.2sq

House Length

16.43m

House Width

12.59m
SVG Black Loader

Dimensions

House Dimensions (Brampton 37)

House Area

336.36m2

House Area (sq)

36.2sq

House Length

16.43m

House Width

12.59m

Dimensions

House Dimensions (Brampton 40)

House Area

368.09m2

House Area (sq)

39.6sq

House Length

19.31m

House Width

12.59m

Customise

Dimensions

For Brampton 43

House Dimensions (Brampton 43)

House Area

395.17m2

House Area (sq)

42.5sq

House Length

20.63m

House Width

13.19m

Facades

View all available facades

Aura

Byron

Como

Evoke

Hampton

Inspire

Kiana

Lana

Omega

Urbane

York

100% fixed price

site cost guarantee

You can access our guarantee even if your land is currently unregistered. Once registration occurs and we are able to carry out approriate diligence we will be able to give a 100% fixed price site cost guarantee.

The 100% fixed price site cost guarantee is for the period from site start to practical completion and includes the following:

  • if export or import of soil is needed - we pay!
  • if additional piering is needed - we pay!
  • if rock excavation is needed - we pay!
  • Costs associated when saline soils - we pay!